Skip To Content
Iron Horse Trail Overcrossing Project
Posted on 07/25/2022
The San Ramon Iron Horse Trail Bollinger Canyon Road Overcrossing Project is fully designed. Construction is expected to begin in early 2023 with an 18–24 month duration. The purpose of the Iron Horse Trail Overcrossing Project is:
  • To improve safety by eliminating conflicts between pedestrians/bicycles  and vehicles;
  • Improve vehicular traffic flow by removing the at-grade crossings;
  • Eliminate unsafe crossing maneuvers by pedestrians and bicyclists;
  • Enhance safety by providing an environment that encourages pedestrian and bicycle usage along the Iron Horse Trail; and
  • Increase trail use by nearby schools by improving safety at the Bollinger Canyon Road and Crow Canyon Road crossings.

More information available for download: