![]() ![]() |
|
|
New Clean Water Requirements for Development
The new “C.3” requirements are separate from-and in addition to-existing requirements for erosion and sediment control and for pollution prevention measures during construction. New development and significant redevelopment project site designs should minimize the area of new roofs, pavements, and other impervious surfaces. Where feasible, pervious surfaces should be implemented so that stormwater runoff can percolate to the underlying soil. Stormwater runoff from impervious areas must be captured and treated before draining into the City's stormwater system and eventually into the Bay. The new permit regulations specify ways to calculate the required size and designs of appropriate stormwater treatment devices. Projects may also be required to detain or infiltrate runoff so that peak flows and durations match pre-project conditions. In addition, project applicants must prepare plans and execute agreements to insure that the stormwater treatment devices are operated and maintained in perpetuity. For more information on these new regulations, see the links below.
If you have any questions regarding the Clean Water Program or the new C.3 guidelines and requirements, please contact Steven Spedowfski at spedowsfski@sanramon.ca.gov or by at (925) 973-2653.
|
|||||
|
engineering@sanramon.ca.gov |