|
|
|
Plan Submittal
Guidelines
Commercial
Alteration/Addition
Remember to always check with the
Planning Division at (925) 973-2560 to confirm zoning requirements prior to beginning your
project!
REQUIRED DOCUMENT SUBMITTAL
(Please provide three (3) complete sets)
job site address; business name; name, address & phone number of
owner; name, address, phone number & stamp/signature of project
designer/architect and/or engineer; occupancy classification(s); type of
construction; basic description of project.
Original Signature (& wet stamp) of
Project Designer(s) is Required On All Drawings.
Plot Plan:
(indicate scale); lot
dimensions; dimensions which indicate the distance from all existing and
proposed buildings to adjacent property lines; north arrow;
identification of all streets and right-of-ways adjacent to the site;
location of easements and visible utilities on site.
Architectural Plan: (indicate scale);
floor plans identifying all room areas and uses; building sections;
details of all fire-rate assemblies; stairway, handrail & guardrail
details; window schedule; door schedule; room finish schedule; exterior
building elevations & exterior wall covering specifications (when
exterior changes are proposed); etc.
Title 24 Disabled Access Plans:
(indicate scale); provide comprehensive plans & specifications
verifying compliance with Chapter 11 of the 2001 California Building
Code for disabled access.
Structural Plans: (indicate scale); when
structural changes are proposed, provide as appropriate;
footing/foundation plan; floor framing plan; roof framing plan;
structural frame details; truss diagrams (including ID#’s and splice
& connection details); structural material specs; etc.
Electrical Plans: complete electrical
plans which identify the location and capacity of the main service
equipment and all distribution panels; detail all computed loads and
ground-fault calculations; locations of all new and/or altered
receptacles, switches, lighting fixtures (reflected ceiling plan); exit
signage; etc.
Plumbing Plans: complete plumbing plans
sufficient to show the size and location of all new and/or altered
plumbing fixtures, appliances, piping, tubing venting, grease traps,
etc.; pipe size calculations (waste/vent, water, roof drain); indicate
whether appliances are gas operated, electric or otherwise; etc.
Mechanical Plans: complete mechanical
plans and/or specifications sufficient to identify the size and location
of all new and/or altered heating; ventilating and air-conditioning
equipment; equipment schedule with BTU rating; gas pipe sizing
calculations; smoke/fire damper locations; etc. Provide details of Type
I hoods, calculations and full compliance with 2001 California
Mechanical Code, Chapter 11, Part II
Please be advised that separate permits will be required for low
voltage (i.e. telephone, computer, and alarm systems), trash enclosures,
Generators, as well as exterior signage.
CALCULATIONS - 2 SETS
-
Structural Calculations -
with wet signature and stamp on each sheet. Wind load design factor is
70 M.P.H. - exposure "C"; seismic zone 4.
-
Title 24 Energy Calculations & Forms:
complete energy documentation (including all required calculations);
Forms ENV-1, LTG-1, LTG-2 & MECH-1, completely filled out and
signed by owner and designer.
OTHER DOCUMENTS:
-
San Ramon Valley Fire Department Receipt
of Construction Drawings, 1500 Bollinger Canyon Road, San Ramon, CA
94583; (925) 838-6600
-
Environmental Health Department Stamp
(required for all food establishments); (925) 370-5064
- Sanitary District Review Stamp by:
Dublin San Ramon Services
District, 7051 Dublin Blvd,
Dublin, CA 94568; (925) 864-4565; or
Central Contra Costa
Sanitary District, 5019 Imhoff Pl,
Martinez, CA 94553; (925) 228-9500
|