INSPECTION REQUIRED AFTER TEAR-OFF COMPLETED
-
Once old roofing materials have been removed an inspection to verify the
condition of the original roof sheathing is required. This inspection
shall be prior to nailing in place any new sheathing over eves and
overhangs.
Inclement
Weather Conditions policy
for the time period of
October 15 to April 15.
-
Installing plywood over space sheathing, stagger joints.
-
Plywood joints to fall on the framing members
(rafters or trusses).
-
Spacing of 1/8" shall be maintained between plywood sheets.
-
Solid fill needed at
horizontal joints.
-
Nailing of plywood sheathing shall be accomplished by using 10d
(3") nails with spacing not to exceed 6 inches o.c. on the edges,
and 12 inches o.c. in the field. No
10d shorts are allowed.
8d's are okay on rakes and tails.
|